STACKING EQUIPMENT

 

Additional infortmation: Director of Ore-Mining and Press-Forging Equipment Production Unit Bobrov Valentin Grigoryevich phone: +38 (0626)47-85-53
Chief Engineer of Ore-Mining and Press-Forging Equipment Production Unit Protynyak Igor Stefanovich phone: +38 (0626)47-88-49
Chief Design Engineer of Ore-Mining and Press-Forging Equipment Production Unit Lavrenko Yuriy Vasilyevich phone: +38 (0626)47-84-50
kgro@nkmz.donetsk.ua
fax: +38 (0626) 47-15-49


 


STACKING EQUIPMENT

 

To transport the materials being stacked, NKMZ offers a range of the conveyor systems and facilities intended for reloading stations, i.e. combined stacker-reclaimers, bucket-whell reclaimers, etc.

    The conveyor systems may be designed depending upon the following processes and operations to be matched:
  • Materials to be unloaded are fed directly to the loading station (railway cars, etc.);
  • Materials to be unloaded are stacked on site (stacking mode);
  • Materials to be stacked are reclaimed and fed to the loading station;
  • Materials already reclaimed are unloaded from the stack by means of the stacker or reclaimer.
  To provide transportation and stacking wastes from the sintering plants to the tailing dumps at the ovemining plants, slime pumps were implemented by NKMZ.